Preliminary Analysis on Organizational Factors Influencing Effective Construction Risk Management: A case study of Nigerian Construction Companies

Authors

  • A.Q. Adeleke School of Technology Management, Universiti Utara Malaysia, 06010 UUM Sintok, Kedah, Malaysia
  • A.Y. Bahaudin School of Technology Management, Universiti Utara Malaysia, 06010 UUM Sintok, Kedah, Malaysia
  • A.M. Kamaruddeen Department of Quantity Surveyinh, School of Built Environment, University College of Technology, Sarawak, Sibu, Malaysia

DOI:

https://doi.org/10.11113/sh.v8n2.876

Keywords:

Effective construction risk management, framework, instrument, validation and reliability

Abstract

An increased demand has been placed on construction projects for more accountability to their clients with measure to the company products and services. However, this demand is because of innumerable antecedent factors repelling effective risk management in construction projects. Therefore, finishing the projects is not only the concern of the industries but also managing the risks involved with the projects. The impacts of effective risk management on the performance of these industries are as well important. The objective of this study is twofold: (i) to propose an inclusive framework which comprises of the antecedent factors proposed in the framework to improve effective risk management in Nigeria construction companies (ii) to measure the instrument used for the preliminary analysis in this study. Data were collected from forty respondents using seventy-five items instrument. SPSS software was used to analyze the data collected for the pilot test. The results of the Cronbach’s Alpha test disclosed a strong internal reliability of the overall instrument and the construct. This research is significant because it explores the implementation of some organizational factors which will influence construction risks and will also improve effective risk management in Nigeria construction projects, and the validation of the instrument which requires further exploration of the constructs in future study

References

Abu Hassan, B. A. B., Ali, K., Onyeizu, E. N., & Yusof, M. N. (2012). Evaluating Risk Management Practices in Construction Company: Evidence from Oman. International Journal of Academic Research, 4(2), 32–37.

Ahmed, S. M., Azhar, S., Castillo, M., & Kappagantula, P. (2002). Construction Delays in Florida: An Empirical Study. Final Report. Department of Community Affairs, Florida, US.

Aibinu, A. A., & Odeyinka, H. A. (2006). Construction Delays And Their Causative Factors In Nigeria. Journal Of Construction Engineering And Management, 132(7), 667–677.

Akanni, P., Oke, A., & Akpomiemie, O. (2014). Impact Of Environmental Factors On Building Project Performance In Delta State, Nigeria. HBRC Journal.

Alaghbari, W. E., Kadir, M. R. A., & Salim, A. (2007). The Significant Factors Causing Delay Of Building Construction Projects In Malaysia. Engineering, Construction and Architectural Management, 14(2), 192–206.

Aniekwu, A. (1995). The Business Environment Of the Construction Company in Nigeria. Construction Management and Economics, 13(6), 445–455.

Artto, K. A. (1999). Management across the Organization. Quest FOR Team Competence Software Project Management Organizational Change AS A Project Factors Impeding Project Management Learning, 5(1), 4.

Asika, N., 1991. Research Methodology In The Behavioral Science. Lagos: Longman Nigeria Plc, Nigeria.

Barber, E., & Wan, J. (2005). Leadership In Project Management: From Firefighter To Firelighter, Management Decision, 43 (7/8), 1032–1039.

Bothroyed, C. & Emmett, J., (1998). Risk Management – A Practical Guide For Professionals. London, UK: Whitherby & Co Ltd.

Bufaied, A. (1987). Risks In The Construction Company: Their Causes And Their Effects At The Project Level. University of Manchester, Institute of Science and Technology.

Creswell, J.W., (2009). Research Design: Qualitative, Quantitative And Mixed Methods Approaches. 3rd Edn., Los Angeles: Sage Publications Ltd.

Dawis, R.V., (1987). Scale Construction. Journal of Counseling Psychology, 34(4): 481–489.

Doloi, H. (2009). Relational Partnerships: The Importance Of Communication, Trust And Confidence And Joint Risk Management In Achieving Project Success. Construction Management and Economics, 27(11), 1099-1109.

El-Sayegh, S. M. (2008). Risk Assessment And Allocation In The UAE Construction Company. International Journal of Project Management, 26(4), 431-438.

Flanagan, R., & Norman, G. (1993). Risk Management And Construction. Oxford, Blackwell Science Ltd.

Frimpong, Y., Oluwoye, J., & Crawford, L. (2003). Causes Of Delay And Cost Overruns In Construction Of Groundwater Projects In A Developing Countries; Ghana As A Case Study. International Journal of Project Management, 21(5), 321–326

Garland, R., 1991. The midpoint on a rating scale: Is it desirable? Marketing Bulletin, 2(May): 66–70.

Geraldi, J. G., Lee-Kelley, L., & Kutsch, E. (2010). The Titanic Sunk, So What? Project Manager Response To Unexpected Events. International Journal of Project Management, 28(6), 547–558.

Gibb, K. (2011). Delivering New Affordable Housing In The Age Of Austerity: Housing Policy In Scotland. International Journal of Housing Markets and Analysis, 4(4), 357–368.

Greenberg, J., & Baron, R.A. (2008). Behavior In Organizations, 9th edition, New Jersey: Pearson prentice hall.

Hair, J., W.C. Black, B.J. Babin and R.E. Anderson, (2010). Multivariate Data Analysis. 7th Edn., Uppersaddle River, New Jersey: Pearson Education International.

Hartog, D. N., & Verburg, R. M. (2004). High Performance Work Systems, organisational culture and firm effectiveness. Human Resource Management Journal, 14(1), 55–78.

Healy, J. R. (1982). Contingency Funds Evaluation. Association for the Advancement of Cost Engineering (AACE) Transactions.

Hertz, D. B., & Thomas, H. (1983). Risk Analysis And Its Applications: Wiley Chichester etc.

Ho, S. S., & Pike, R. H. (1992). The Use Of Risk Analysis Techniques In Capital Investment Appraisal. Risk Analysis Assessment and Management, 71–94.

Hofstede, G., Neuijen, B., Ohayv, D. D., & Sanders, G. (1990). Measuring Organizational Cultures: A Qualitative And Quantitative Study Across Twenty Cases. Administrative Science Quarterly, 286–316.

Iroegbu, A.N. (2005). Housing In Nigeria: A Role Of The Construction Company. In A.I. Kalu & G.N. Chima (eds). Housing development in Nigeria: Concepts, Issues And Strategies. Abakaliki: Pauliton press.

Ismail, E. (2001). “Industrialized Building System For Housing In Malaysiaâ€, Paper Presented at the 6th Asia Pacific Science and Technology Management Seminar, Tokyo.

Israelsson, N., & Hansson, B. (2009). Factors Influencing Flexibility In Buildings. Structural Survey, 27(2), 138–147.

Jaafari, A. (2001). Management of risks, uncertainties and opportunities on projects: time for a fundamental shift. International Journal of Project Management, 19(2), 89-101.

Jabnoun, N., & Sedrani, K. (2005). TQM, Culture, And Performance In UAE Manufacturing Firms. Quality Management Journal, 12(4), 8.

Jarkas, A. M., Haupt, T. C., & Haupt, T. (2015). Major Construction Risk Factors Considered By General Contractors in Qatar. Journal of Engineering, Design and Technology, 13(1).

Kamaruddeen, A. M., Yusof, N. A., Said, I., & Pakir, A. H. K. (2012). Organizational Factors and Innovativeness of Housing Developers. American Journal of Applied Sciences, 9(12).

Kangari, R., & Riggs, L. S. (1989). Construction Risk Assessment By Linguistics. Engineering Management, IEEE Transactions on, 36(2), 126–131.

Karim Jallow, A., Demian, P., N. Baldwin, A., & Anumba, C. (2014). An empirical study of the complexity of requirements management in construction projects. Engineering, Construction and Architectural Management, 21(5), 505-531.

Krosnick, J.A. and L.R. Fabrigar, 1991. Designing Rating Scales For Effective Measurement In Surveys. In B. Lyberg, P. Colllins, M. De Leeuw, E. Dippo, C. Schwarz, N. (Ed.), Survey Measurement And Process Quality. (Trewined.). New York: John Wiley & Sons, Inc.

Kumar, M., Abdul Talib, S., & Ramayah, T. (2013). Business Research Methods. New York: Oxford University press.

Kumaraswamy, M. M., & Chan, D. W. (1998). Contributors To Construction Delays. Construction Management & Economics, 16(1), 17–29.

Malhotra, N.K., 2008. Essentials Of Marketing: An Applied Orientation. 2nd Edn., Australian: Pearson Education.

Mason, G. E. (1973). Quantitative Risk Management Approach to the Selection of Construction Contract Provisions: Department of Civil Engineering, Stanford University.

Mezher, T. M., & Tawil, W. (1998). Causes Of Delays In The Construction Company in Lebanon. Engineering, Construction and Architectural Management, 5(3), 252–260.

Mills, A. (2001). A systematic Approach To Risk Management For Construction: Structural Survey. Victoria, Australia, University Press: University of Melbourne.

Moavernzadeh.F.& Rasow.J.(1999). Risks and risk analysis in construction management, Proceedings of the CIB W65, Symposium on Organization and Management of Construction, US National Academy of Science, May, 1999, Washington DC, USA.

Moe, T. L., & Pathranarakul, P. (2006). An Integrated Approach To Natural Disaster Management: Public Project Management And Its Critical Success Factors. Disaster Prevention and Management, 15(3), 396–413.

Niu, Y. (2008). The Performance And Problems Of Affordable Housing Policy In China: The Estimations Of Benefits, Costs And Affordability. International Journal of Housing Markets and Analysis, 1(2), 125-146.

Obalola, T.F, (2006). Evaluation Of The Effects Of Project Environment On Project Performance in Lagos and Abuja, Nigeria (dissertation), Federal University Technology, Akure, Nigeria.

Odeh, A. M., & Battaineh, H. T. (2002). Causes Of Construction Delay: Traditional Contracts. International Journal of Project Management, 20(1), 67–73.

Oladapo, R.A, Olotuah, A.O, (2007). Appropriate Real Estate Laws And Policies For Sustainable Development In Nigeria, J. Struct. Surv. 25 (3/4), 330–338.

Pallant, J., 2001. SPSS Survival Manual: A Step By Step Guide To Data Analysis Using SPSS For Windows. 3rd Edn., England: Mcgraw Hill Open University Press.

Pallant, J., 2011. SPSS Survival Manual: A Step By Step Guide To Data Analysis Using SPSS program. England: McGraw Hill Open University Press.

Perry, J.H. and Hayes, R.W. (1985), “Risk and Its Management In Construction Projectsâ€, Proceedings of the Institution of Civil Engineering, 78(3), 499–521.

Porter, C. (1981). Risk Allowance In Construction Contracts. Unpublished MSc. project report.

Sambasivan, M., & Soon, Y. W. (2007). Causes And Effects Of Delays In Malaysian Construction Company. International Journal of Project Management, 25(5), 517–526.

Schein, E. H. (2004). Organizational Culture and Leadership.

Scupola, A. (2003). The Adoption Of Internet Commerce By Smes In The South Of Italy: An Environmental, Technological And Organizational Perspective. Journal of Global Information Technology Management, 6(1), 52–71.

Sekaran, U. and R. Bougie, 2009. Research Methods For Business: A Skill Building Approach. 5th Edn., United Kingdom: John Wiley & Sons Ltd.

Sekaran, U., 2003. Research Methods For Business. 4th Edn., New York: John Wiley & Sons Inc.

Sekaran, U., Robert, Y. C., & Brain, L. D. (2001). Applied Business Research.1st Edition. Australia: John Wiley & Sons Australian Ltd.

Simpkins, R. A. (2009). How Great Leaders Avoid Disaster: The Value Of Contingency Planning. Business Strategy Series, 10(2), 104–108.

Sommerville, J., & Craig, N. (2006). Implementing IT in construction: Routledge.

Sun, M., & Meng, X. (2009). Taxonomy For Change Causes And Effects In Construction Projects. International Journal of Project Management, 27(6), 560–572.

Sweis, G., Sweis, R., Abu Hammad, A. & Shboul, A. (2008). Delays In Construction Projects: The Case Of Jordan. International Journal of Project Management 26, 665–674.

Walker, A. (2000). Project Management in Construction, Oxford, Blackwell Science Ltd.

Downloads

Published

2016-03-31

How to Cite

Adeleke, A., Bahaudin, A., & Kamaruddeen, A. (2016). Preliminary Analysis on Organizational Factors Influencing Effective Construction Risk Management: A case study of Nigerian Construction Companies. Sains Humanika, 8(2). https://doi.org/10.11113/sh.v8n2.876

Issue

Section

Articles