Project Practitioners’ Competency in Malaysian Construction Industry
DOI:
https://doi.org/10.11113/sh.v9n1-4.1126Keywords:
Project success, competency, learning, constructionAbstract
The purpose of this study is to investigate which competencies are perceived importance by the project practitioners in order for them to perform accordingly towards achieving project objectives. At the same time, the study also allows the opportunity to evaluate their keenness on self-learning which is important for project practitioners to continuously enhancing their skills. Questionnaires are distributed at one of Malaysian Government Department, which is responsible for the construction of government infrastructure projects in the country. Total of 179 respondents gave their feedbacks during a training, a workshop and talk events. Six (6) types of competencies were measured. The findings indicate that three most important competencies perceived by project practitioners are Behavioral, Technical Generic and Generic competencies. On top of that, feedbacks on self learning elements shows that the project practitioners are agreeable and aware on the importance of learning and are willing to take up their own time to learn by themselves. This study revealed the behavioral competency is the most importance competency perceived by the project practitioners. With this information, the Department could plan the project practitioners’ development programs more effectively and drive the motivation to learn continuously. Effective learning creates skilled human resources who could withstand the competitive environment in the construction industry.Â
References
Ahmad, B. E. and Majid, F. A. (2010). Self-directed Learning and Culture: A Study on Malay Adult Learners. Procedia - Social and Behavioral Sciences, 7, 254-263.
Armstrong, G. (2015). Global Construction Survey 2015: Climbing the Curve. USA, KPMG International. Retrieved from https://home.kpmg.com/xx/en/home/insights/2015/03/global-construction-survey.html
Baker, B. N., Murphy, D. C., & Fisher, D. (1988). Factors affecting project success. In Cleland, D.I., King, W.R. (Eds.). Project Management Handbook, 2nd ed., New York: VanNostrand Reinhold, 902-919
Barlow, G., Woolley, P., Rutherford, L. and Conradie, C. (2013). Project Management Survey Report. New Zealand, KPMG: 1 - 34.
Becerik-Gerber, B., Ku, K. H. and Jazizadeh, F. (2012). BIM-Enabled Virtual and Collaborative Construction Engineering and Management. Journal of Professional Issues in Engineering Education and Practice, 138(3), 234-245.
Belassi, W. and Tukel, O. I. (1996). A New Framework for Determining Critical Success/Failure Factors in Projects. International Journal of Project Management, 14(3), 141 - 151.
Berkun, S. (2008). Making Things Happen: Mastering Project Management. O'Reilly.
Braun, M. S. P. (2015). Project and Programme Management Survey 2015. Sweden, KPMG: 32.
Brière, S., D. Proulx, Flores, O. N. and Laporte, M. (2015). Competencies of Project Managers in International NGOs: Perceptions of Practitioners. International Journal of Project Management, 33(1), 116-125.
Chandler, M. K. and L. R. Sayles (1971). Managing Large Systems. New York.
Cleland, D. I. and King, W. R. (1975). Systems Analysis and Project Management. New York: McGraw-Hill.
Construction Industry Development Board. (2014). Construction Industry Recorded RM92.3 billion of Worth of Projects. CIDB News, 22-23.
Davis, K. (2014). Different Stakeholder Groups and Their Perceptions of Project Success. International Journal of Project Management, 32(2), 189 - 209.
Department of Statistics Malaysia. (2016). Gross Domestic Product Third Quarter 2016.
Gillard, S. (2009). Soft Skills and Technical Expertise of Effective Project Managers. Issues in Informing Science and Information Technology, 6, 723-729.
Hussin, J. M., Rahman, I. A., and Memon, A. H. (2013). The Way Forward in Sustainable Construction: Issues and Challenges. International Journal of Advances in Applied Sciences, 2(1), 15-24.
IPMA, I. P. M. A. (2006). ICB - IPMA Competence Baseline, Version 3.0. Netherlands, International Project Management Association: 1 - 213.
Jacobs, R. L. (2010). Training and Learning in the Workplace. International Encyclopedia of Education (Third Edition). P. P. B. McGaw. Oxford, Elsevier: 328-336.
Jałocha, B., Krane, H. P., Ekambaram, A. and Prawelska-Skrzypek, G. (2014). Key Competences of Public Sector Project Managers. Procedia - Social and Behavioral Sciences, 119, 247-256.
Johns, R. (2010). Likert Items and Scales. Colchester: UK Data Archive. Survey Question Bank Methods Fact Sheet 1.
Kelley, K., Clark, B., Brown, B., and Sitzia, J. (2003). Good Practice in the Conduct and Reporting of Survey Research. International Journal for Quality in Health Care, 15(3): 261-266.
Kerzner, H. (2009). Project Management A Systems Approach To Planning, Scheduling And Controlling. USA, John Wilet & Sons, Inc.
Khan, R. A., M. S. Liew and Ghazali, Z. B. (2014). Malaysian Construction Sector and Malaysia Vision 2020: Developed Nation Status. Procedia - Social and Behavioral Sciences, 109: 507-513.
Kwak, Y.-H. (2005). A Brief History of Project Management, Greenwood Publishing Group.
Mahmood, A. P. D. A., A. M. A. Hamidaddin and D. M. W. M. Shafiei (2006). What Competencies Do Project Managers Need? International Conference On Construction Industry (ICCI). Pendang, Indonesia.
Malik, M. E. and Danish, R. Q. (2010). Impact of Motivation to Learn and Job Attitudes on Organizational Learning Culture in a public service organization of Pakistan. Research Journal of South Asian Studies, 25(2), 217 - 235.
McHenry, R. L. (2008). Understanding the Project Manager Competencies in a Diversified Project Management Community Using a Project Management Competency Value Grid, Capella University.
Ministry of Finance. (2013). Bajet Kerajaan Persekutuan 2013. Ministry of Finance. Kuala Lumpur.
Ministry of Finance. (2014). Economic Report 2013/2014. Kuala Lumpur: 1-60.
Nguyen, L. D., S. O. Ogunlana and Lan, D. T. X. (2004). A Study on Project Success Factors in Large Construction Projects in Vietnam. Engineering Construction and Architectural Management, 11(6), 404 - 413.
Olanrewaju, A. L. and A.-R. Abdul-Aziz (2015). An Overview of the Construction Industry. Building Maintenance Processes and Practices, Springer, 9-32.
Oxford (2016). Learning. English Oxford Living Dictionaries. Oxford University Press.
Pinto, J. K. and Selvin, D. P. (1987). Critical Factors in Successful Project Implementation. IEEE Transactions of Engineering Management, EM-34(1), 22 - 27.
Rockart, J. F. and Sloan, W. (1982). The Changing Role of the Information Systems Executive: A Critical Success Factors Perspective. Massachusetts Institute of Technology.
Santos, J. R. A. (1999). Cronbach’s Alpha: A Tool for Assessing the Reliability of Scales. Journal of Extension, 37(2), 1-5.
Sanvido, V., Grobler, F., Parfitt, K., Guvents, M., and Coyle, M. (1992). Critical Success Factors of Construction Projects. Journal of Construction Engineering and Management, 118(1), 94 - 111.
Shivakumar, R. P. (2015). Project Management Overview. International Journal of Pharmaceutical Sciences and Business Management, 3(1), 1-4.
Singh, V. (2015). Project Management Origins & Methodology Evolution in past 4,500 Years. Retrieved from https://www.linkedin.com/pulse/project-management-origins-methodology-evolution-past-vikram-singh.
Steffens, K. (2015). "Competences, Learning Theories and MOOCs: Recent Developments In Lifelong Learning. European Journal of Education, 50(1), 41-59.
Takey, S. M. and Carvalho, M. M. D. (2015). Competency Mapping in Project Management: An Action Research Study in an Engineering Company. International Journal of Project Management, 33(4), 784-796.
Tauber, T., T. Smolen and C. Probst (2016). How the Workforce Learns in 2016. Retrieved from http://get.degreed.com/how-the-workforce-learns-in-2016-report
Training Daily Advisor. (2016). Classroom Training: The Pros and the Cons. Training Daily Advisor, 1.
Training Daily Advisor. (2016). The Most Effective Training Techniques. 5.
Tsiga, Z., M. Emes and A. Smith (2016). Critical Success Factors For The Construction Industry. PM World Journal, V(VIII), 1-12.
Weaver, P. (2007). The Origins of Modern Project Management. Fourth annual PMI College of Scheduling Conference.
Yong, Y. C. and N. E. Mustaffa (2012). Analysis of Factors Critical to Construction Project Success in Malaysia. Engineering Construction and Architectural Management, 19(5): 543 - 556.